Project Description
The Prospect Water Filtration Plant (PWFP) is a critical infrastructure site that supplies 85% of Sydney’s drinking water. PWFP is a large site requiring a broad range of extensive support with a variety of specialist skill sets.We are engaged by SUEZ to assist driving the ongoing maintenance and continuous improvement of the prospect plant control system.We have drafted the PWFP control specification, used to specify the control system hardware and software products to be used at PWFP and provide guidelines for the site coding standards. The guidelines provided the site minimum acceptable process standards.